Project Summary
Mustique Island’s power landscape undergoes a transformative shift as renewable energy steps into the spotlight.
Our latest project, featuring a 3MWP system paired with a 7.63MWh Battery Energy Storage System (BESS), marks a departure from traditional diesel generators to a cutting-edge, sustainable energy source.
Solar Watt Systems Inc. illuminates the grid with this remarkable solar installation, ushering in a brighter, greener future.
Specifications
Size of Battery System
7.63 MWh
Size of PV Plant
3 MWp
Total Panels Installed
5950